Topic starter
No. There are two relevant bullets under 11.2(26) that would be a Disallowed Cost to do with defects:
– the cost of correcting Defects after Completion, and
– the cost of correcting Defects caused by the Contractor not complying with a constraint on how it is to Provide the Works stated in the Scope
Posted : 09/12/2025 3:06 pm